Enviro Site Services Pty Ltd has successfully completed numerous projects over the years, some examples of such projects, what was required on each project are listed below, for photos check out the GALLERY

 

 

Anglo American Metallurgical Coal
Dawson Mine – Moura

  • removal of asbestos materials
  • removal / demolition of buildings
  • recycling / re-sale of equipment and furnishings

Brisbane City Council
Sherwood Rd Bus Depot – Sherwood, Brisbane

  • removal of asbestos materials
  • demolition of multiple burnt out structures
  • recycling of steel and concrete
  • remediation of site

University of Queensland
TEDI Building, St LuciaCampus 

  • removal of asbestos materials
  • strip out of building
  • demolition of structure
  • works had to be of precision as high tech lab adjoined building
  • recycling of materials

Endeavour Road Cable Stay Bridge 

  • demolition of cable stay bridge over Ipswich Highway

Naval Stores
Fortitude Valley Brisbane

  • emergency demolition of building structure and wharf
  • emergency set up time 3 hours from project appointment
  • round the clock work
  • 24 hour onsite security
  • 0% pollution tolerance on the Brisbane River
  • QLD Transport (Marine Department) recommended
  • Q-Build recommended

King George Square Car Park
Brisbane City

  • slab demolition and asbestos removal works
  • demolition of ½ vertical section of 6 level subground commercial car park
  • bonded asbestos
  • environmental dust, noise and vibration containment
  • round the clock work
  • central business district location next to Town Hall
  • traffic and pedestrian management
  • remaining part of the car park had to remain trading

111 Eagle Street
Brisbane City

  • high-rise demolition and asbestos removal works
  • demolition of 17 level high-rise building and 4 level subground car park
  • specialized mechanical and precision demolition works
  • bonded and friable asbestos
  • environmental considerations: dust, noise and vibration containment
  • central business district location in direct proximity to other high-rise: commercial and residential
  • traffic and pedestrian management
  • dual use work site - a section of works required demolition to take place while commercial and retail trading continued on site.

Marrickville Factory
Brisbane City

  • asbestos removal and commercial demolition works
  • removal of Asbestos products from building and disposal
  • demolition of multi-storey industrial building and site works

Wintergarden Theatre
Townsville, Queensland

  • commercial demolition and environmental rehabilitation works
  • demolition of building
  • removal of arsenic contaminated materials and soil
  • approximately 5000 m³
  • monitoring and testing of site

James Hardie Factory
Newstead, Brisbane

  • asbestos removal and general demolition works
  • largest asbestos removal project in Southern Hemisphere at the time
  • demolish industrial structure and remove plant and equipment
  • decontaminate site
  • approximately 50,000m³ of asbestos
  • product and residue monitoring and testing of site

DPI Building
Brisbane City

  • high-rise demolition and environmental rehabilitation works
  • demolition of multi-storey commercial building
  • approximately 100,000m³
  • fumigation of timber on site due to West Indian Termite
  • large proportion of waste materials recycled

Lang Park Stadium
Paddington, Brisbane

  • removal of Grandstand in priority around the clock timeframe
  • removal of approx. 75,000 m³ of materials
  • project completed within two weeks - 24 hours a day
  • historical materials recycled eg. seating timbers

Newstead River Park
Newstead, Brisbane

  • asbestos removal, environmental rehabilitation and general demolition works
  • demolition of various buildings and structures
  • approximately 4000m2
  • demolition of Wharf
  • demolition of Gasholder
  • excavation of contaminated materials

Caboolture Shire Retail Shops
Caboolture Shire

  • general demolition and environmental rehabilitation works
  • demolition of block of retail shops
  • local area traffic management
  • landscape of level site with turf on completion

QCL Vessel ,“Calaca”

  • removal of 1,000 linear meters asbestos lagging
  • full containment of removal area
  • strict timeframe
  • completed on time

Wintergarden Theatre
Townsville, QLD

  • commercial demolition and environmental rehabilitation works
  • demolition of building
  • removal of arsenic contaminated materials and soil
  • monitoring and testing of site
  • approximately 5000 m³

Barneys Point Bridge
Tweed Heads, NSW

  • marine demolition and environmental rehabilitation works
  • demolish and remove bridge and concrete pylons
  • strict EPA controls on site
  • lead Paint Decontamination of structure

Hayman Island Jetty
Hayman Island, QLD

  • 1km long jetty removal
  • removal of fuel storage line
  • 0% pollution & disruption to Barrier Reef

Port of Brisbane – Wharf 8

  • demolition of concrete wharf
  • removal of steel piles
  • working from wharf and waterside

William Gunn Jetty
Manly

  • demolition of jetty with marine equipment
  • working from waterside